
Switchgear Repair: Rapid Response to Catastrophic Equipment Failure
Prime Power Case Study
Client: 12-Story Office Tower and Trade Center
Industry: Class A Facilities
Location: Atlanta
Challenge:
A critical incident occurred when generator switchgear catastrophically failed during nighttime hours, resulting in a complete power outage across the 310,000+ square-foot facility. With no onsite personnel available to address the emergency, Prime Power immediately dispatched two EGSA-certified technicians.
Solution:
Result:
The building
was fully operational before tenants arrived in the morning, resulting in no
downtime or lost revenues for tenants in either the Trade Center or the office
building.
Learn More about Switchgear Services